Close
A local project for Doosan Babcock last month at GlaxoSmitKline, Montrose for a steel structured walkway.
We fabricated and installed the walkway to the MIBK tank (which was supplied to use by another of their suppliers) at our yard, storing it until the client was ready for installation. This meant that the timescale onsite was minimised as much as possible, reducing disruption to their daily operations.
Once complete, we transported and installed it into position; using a low loader from local haulage company Geddes Group with Ainscough Crane Hire helping us manoeuvre it into place.